Set Up

Intuitive. Simple. Safe.

Setting up a Monolyte projection screen is as simple as it sounds even for low utilization users.

Frame Set up

1 Set the screen so that the legs are placed towards the ground. 2-4 Unfold the frame along the horizontal bars. The snap joints will engage automatically. 5-7 Unfold the leg elements to both sides and close the hinges. 8-10 Raise the upper horizontal frame bar. The snap joints will engage automatically. 11-12 Close the four corner hinges.

Surface and skirt mounting

1 Lay out the surface on the frame with the label „OBEN-TOP“ corresponding with the upper frame bar. 2-3 Attach the surface to the frame. Press on the projection surface by starting at one corner and fasten the buttons one by one. 4 Lift the screen to unfold the legs. The snap joints will engage automatically. 5-6 Secure the legs with the corner hinges on the backside of the frame. 7-8 Finally attach the drape along the double studs on the projection surface and along the lateral studs on the legs. 

Downloads